Rebuilt 72-18 Simonazzi Bottle Filler
Capper (Alcoa C.I.H.) B227.6-18#11 18 Head
1. New table bearing
2. New turret bearings
3. New electric sorter and Chute Assembly (Alcoa)
4. New jack shaft
5. New jack shaft bearings
6. -family: "Comic Sans MS";">New jackshaft gear box and motor
7. New cam followers & bearings on spindles
8. New bearings and seals in headsets (completely rebuilt)
9. New magnets as needed
10. Most components hard chromed
11. New stainless support posts.
12. Reground and chromed base plate
13. New proximities
14. New plexiglass covers
15. New airlines
16. New caution decals
17. New Mac valves
18. New air regulator
19. New star bearings.
20. New cap release.
21. New spindle knock out rods.
Carousel 1. New vertical drive shaft with double keyway. 2. New bearings and seals in the vertical shaft assembly. 3. Completely rebuilt Rossi reducer along with double keys. 4. All bowl raise gearboxes completely rebuilt. 5. All new line shafts and universals on bowl raise system. 6. New bowl raise air motor and fittings. 7. Bowl raise jack shafts have new boots installed. 8. Complete new clamping system for bowl raising. 9. New liquid level control system. 10. New stainless adjusting screws for legs. 11. Much new SS sheet metal. 12. New 80# Stainless relief valve. 13. Complete new actuator assemblies. 14. V.E. standard flow valves completely rebuilt. 15. Centering devices completely rebuilt. 16. New pressure cup system. This runs $18,000.00 17. Hanger for lifts machined and new bushings installed. 18. New lift guides. 19. New lift rollers 20. Rebuilt lift cylinders. 21. Center column completely rebuilt. 22. New bowl lid gaskets. 23. New numbers. 24. Rhino lining paint. 25. New water solenoids and lines. 26. New lines for air and CO2. 27. New Stainless grease lines. 28. Remote oil reservoirs for Rossi reducers. (2) 29. Lift oiler system by Lincoln. 30. Control ring system has many new items. 31. New snift rail assembly. 32. Boots on bowl raise jack shafts. 33. CIP pipe and brackets. 34. New sight glass gasket Table 1. All pedestals rebuilt with new bearings and seals. 2. New stainless grease lines on everything. (Originally copper) 3. Conveyor gearbox completely rebuilt. 4. Wormfeed gearbox completely rebuilt. 5. Main drive gear is new. 6. Rebuilt 14:3.1 table box. 7. Painted with Rhino liner paint. 8. New Stainless leg bolts. 9. Totally new air system to include regulators, valves, gauges and fittings. 10. New SS water chute. 11. New SS handling equipment posts. 12. New conveyor drive gear. 13. New worm feed timing gear. 14. New conveyor bearings 15. New infeed conveyor drive sprocket. 16. New bottle stop cylinder. 17. New discharge conveyor safety table and bearings. Electrical 1. Every wire is new. 2. New 5’ x 6’ Stainless enclosure. 3. New panel view 600 by A-B. 4. Powerflex 700. 5. Slc 5/04 CPU 6. All new solenoids. 7. Capper wired through main PC. 8. All New secondary enclosures. 9. 100’ wire spool to remote locate the main panel 10. New photo eye set up for valve trip system. Hyde Park Speeds TBS Ultra Flow Valve 20 ounce Plastic bottles 550 BPM- 575BPM on CSD’s not to exceed 4.1 volumes of CO2 and dissolved oxygen content of less than 1 PPM. 20 ounce water. Over 600BPM 2-Liter Plastic bottles. 265-290 BPM on CSD’s not exceeding 4.1 volumes of CO2 and dissolved oxygen content of less than 1 PPM 2-Liter water 290 BPM Based on 46 active valves and 26 inactive valves.